Blacksmith Tap - Spring Grove 69kV Line (J584)

Blacksmith Tap - Spring Grove 69kV Line is a 60.0 MW wind interconnection project in Green County, Wisconsin with a current status of withdrawn. It is proposed to connect at Blacksmith Tap - Spring Grove 69kV Line.

60.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameBlacksmith Tap - Spring Grove 69kV Line
Queue IDJ584
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity60.0 MW
StateWisconsin
CountyGreen County
Point of interconnectionBlacksmith Tap - Spring Grove 69kV Line
Requested (queue) date2016-05-09
Proposed in-service date2018-09-15
Operational date2018-09-15
Withdrawn date2020-09-29
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata