Blackstone to Marshall 138kV (J1310 POI) (J1552)

Blackstone to Marshall 138kV (J1310 POI) is a 100.0 MW solar interconnection project in Jackson, Michigan with a current status of withdrawn. It is proposed to connect at Blackstone to Marshall 138kV (J1310 POI).

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBlackstone to Marshall 138kV (J1310 POI)
Queue IDJ1552
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateMichigan
CountyJackson
Point of interconnectionBlackstone to Marshall 138kV (J1310 POI)
Requested (queue) date2020-06-22
Proposed in-service date2023-09-01
Operational date2023-09-01
Withdrawn date2022-01-06
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata