Blenheim Gilboa Storage (0185)
Blenheim Gilboa Storage is a 120.0 MW battery interconnection project in Schoharie, New York with a current status of operational. It is proposed to connect at Valenti Rd., Gilboa 345kV.
120.0 MWCapacity
OperationalStatus
FMarket
BatteryTechnology
Project facts
| Canonical name | Blenheim Gilboa Storage |
|---|---|
| Queue ID | 0185 |
| Status | operational |
| Source status | 14 |
| Market | F |
| Technology | Battery |
| Capacity | 120.0 MW |
| State | New York |
| County | Schoharie |
| Point of interconnection | Valenti Rd., Gilboa 345kV |
| Requested (queue) date | 2005-03-29 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | NY Power Authority |
| Utility / transmission owner | NYPA |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata