Blooming Grove to West Damascus 69 kV (AB2-012)

Blooming Grove to West Damascus 69 kV is a 19.9 MW gas interconnection project in Wayne, Pennsylvania with a current status of withdrawn.

19.9 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameBlooming Grove to West Damascus 69 kV
Queue IDAB2-012
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity19.9 MW
StatePennsylvania
CountyWayne
Point of interconnection—
Requested (queue) date2015-12-09
Proposed in-service date2018-06-01
Operational date—
Withdrawn date2018-08-03
Developer—
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata