Bluewater CDEC 1 (62994_NMBW1)

Bluewater CDEC 1 is a 2.4 MW solar interconnection project in Cibola, New Mexico with a current status of operational.

2.4 MWCapacity
OperationalStatus
PNMMarket
SolarTechnology

Project facts

Canonical nameBluewater CDEC 1
Queue ID62994_NMBW1
Statusoperational
Source status(OP) Operating
MarketPNM
TechnologySolar
Capacity2.4 MW
StateNew Mexico
CountyCibola
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2019-12-01
Withdrawn date—
Developer—
Utility / transmission ownerLightsource Renewable Energy Asset Management, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.