BOLTON - RAYMOND-CAPLINE 115.0kV (J2370)

BOLTON - RAYMOND-CAPLINE 115.0kV is a 100.0 MW solar interconnection project in Hinds, Mississippi with a current status of withdrawn. It is proposed to connect at BOLTON - RAYMOND-CAPLINE 115.0kV.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBOLTON - RAYMOND-CAPLINE 115.0kV
Queue IDJ2370
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateMississippi
CountyHinds
Point of interconnectionBOLTON - RAYMOND-CAPLINE 115.0kV
Requested (queue) date2022-09-15
Proposed in-service date2024-12-01
Operational date2024-12-01
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.