Bonny Eagle Energy Storage - Uprate (1104)
Bonny Eagle Energy Storage - Uprate is a 8.0 MW battery interconnection project in York, Maine with a current status of operational. It is proposed to connect at The battery will connect to Brookfield owned 34.5kV bus inside the Bonny Eagle Power station. The Bonny Eagle Power Station 34.5kV bus ties in to the CMP owned Bonny Eagle substation..
Project facts
| Canonical name | Bonny Eagle Energy Storage - Uprate |
|---|---|
| Queue ID | 1104 |
| Status | operational |
| Source status | C |
| Market | ME |
| Technology | Battery |
| Capacity | 8.0 MW |
| State | Maine |
| County | York |
| Point of interconnection | The battery will connect to Brookfield owned 34.5kV bus inside the Bonny Eagle Power station. The Bonny Eagle Power Station 34.5kV bus ties in to the CMP owned Bonny Eagle substation. |
| Requested (queue) date | 2021-03-11 |
| Proposed in-service date | — |
| Operational date | 2023-04-20 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.