Border 345kV (GEN-2011-049)

Border 345kV is a 250.7 MW wind interconnection project in Beckham County, Oklahoma with a current status of withdrawn. It is proposed to connect at Border 345kV.

250.7 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameBorder 345kV
Queue IDGEN-2011-049
Statuswithdrawn
Source statusTERMINATED
MarketOK
TechnologyWind
Capacity250.7 MW
StateOklahoma
CountyBeckham County
Point of interconnectionBorder 345kV
Requested (queue) date2011-09-30
Proposed in-service date2020-07-31
Operational date
Withdrawn date2020-08-19
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata