Border Winds Wind Farm (59200_1)

Border Winds Wind Farm is a 150.0 MW wind interconnection project in Rolette, North Dakota with a current status of operational.

150.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameBorder Winds Wind Farm
Queue ID59200_1
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyWind
Capacity150.0 MW
StateNorth Dakota
CountyRolette
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2015-08-01
Withdrawn date
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata