Bowman 230kV substation (GEN-2020-006)

Bowman 230kV substation is a 250.0 MW solar interconnection project in Bowman County, North Dakota with a current status of withdrawn. It is proposed to connect at Bowman 230kV substation.

250.0 MWCapacity
WithdrawnStatus
NDMarket
SolarTechnology

Project facts

Canonical nameBowman 230kV substation
Queue IDGEN-2020-006
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologySolar
Capacity250.0 MW
StateNorth Dakota
CountyBowman County
Point of interconnectionBowman 230kV substation
Requested (queue) date2020-04-23
Proposed in-service date2026-12-31
Operational date
Withdrawn date2024-03-11
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata