Bowman Street 115 kV SS - Augusta Area Study (1071)
Bowman Street 115 kV SS - Augusta Area Study is a 9.9 MW solar+battery interconnection project in Kennebec, Maine with a current status of operational. It is proposed to connect at CMP BOWMAN STREET Substation, Circuit 263D1.
9.9 MWCapacity
OperationalStatus
MEMarket
Solar+BatteryTechnology
Project facts
| Canonical name | Bowman Street 115 kV SS - Augusta Area Study |
|---|---|
| Queue ID | 1071 |
| Status | operational |
| Source status | C |
| Market | ME |
| Technology | Solar+Battery |
| Capacity | 9.9 MW |
| State | Maine |
| County | Kennebec |
| Point of interconnection | CMP BOWMAN STREET Substation, Circuit 263D1 |
| Requested (queue) date | 2020-10-02 |
| Proposed in-service date | — |
| Operational date | 2022-12-30 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata