Bowman Street 115 kV SS - Augusta Area Study (1076)

Bowman Street 115 kV SS - Augusta Area Study is a 5.0 MW solar+battery interconnection project in Kennebec, Maine with a current status of withdrawn. It is proposed to connect at CMP WEST STREET Substation, Circuit 255D1.

5.0 MWCapacity
WithdrawnStatus
MEMarket
Solar+BatteryTechnology

Project facts

Canonical nameBowman Street 115 kV SS - Augusta Area Study
Queue ID1076
Statuswithdrawn
Source statusW
MarketME
TechnologySolar+Battery
Capacity5.0 MW
StateMaine
CountyKennebec
Point of interconnectionCMP WEST STREET Substation, Circuit 255D1
Requested (queue) date2020-10-02
Proposed in-service date2023-06-27
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata