Brady Wind Energy Center (60355_BWEC1)

Brady Wind Energy Center is a 150.0 MW wind interconnection project in Stark, North Dakota with a current status of operational.

150.0 MWCapacity
OperationalStatus
SWPPMarket
WindTechnology

Project facts

Canonical nameBrady Wind Energy Center
Queue ID60355_BWEC1
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologyWind
Capacity150.0 MW
StateNorth Dakota
CountyStark
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2016-11-01
Withdrawn date
Developer
Utility / transmission ownerBrady Wind II, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.