Brantley 138kV (GEN-2010-012)

Brantley 138kV is a 65.0 MW wind interconnection project in Roger Mills County, Oklahoma with a current status of withdrawn. It is proposed to connect at Brantley 138kV.

65.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameBrantley 138kV
Queue IDGEN-2010-012
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity65.0 MW
StateOklahoma
CountyRoger Mills County
Point of interconnectionBrantley 138kV
Requested (queue) date2010-03-31
Proposed in-service date
Operational date
Withdrawn date2012-11-07
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata