Bridgeport I5 Commercial/Industrial Project (L0531)

Bridgeport I5 Commercial/Industrial Project is a 20.7 MW other interconnection project in King, Washington with a current status of operational. It is proposed to connect at BPA's Surprise Lake Substation.

20.7 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical nameBridgeport I5 Commercial/Industrial Project
Queue IDL0531
Statusoperational
Source statusBPA COMPLETED
MarketWA
TechnologyOther
Capacity20.7 MW
StateWashington
CountyKing
Point of interconnectionBPA's Surprise Lake Substation
Requested (queue) date2022-06-28
Proposed in-service date
Operational date2025-06-25
Withdrawn date
DeveloperCity of Milton
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata