Brown 138kV (GEN-2016-030)

Brown 138kV is a 100.0 MW solar interconnection project in Johnston Co, Oklahoma with a current status of operational. It is proposed to connect at Brown 138kV.

100.0 MWCapacity
OperationalStatus
OKMarket
SolarTechnology

Project facts

Canonical nameBrown 138kV
Queue IDGEN-2016-030
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketOK
TechnologySolar
Capacity100.0 MW
StateOklahoma
CountyJohnston Co
Point of interconnectionBrown 138kV
Requested (queue) date2016-03-30
Proposed in-service date
Operational date2021-08-28
Withdrawn date
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata