BROWNSTOWN - ENRICO FERMI #3 345.0kV (J3845)

BROWNSTOWN - ENRICO FERMI #3 345.0kV is a 250.0 MW battery interconnection project in Monroe, Michigan with a current status of withdrawn. It is proposed to connect at BROWNSTOWN - ENRICO FERMI #3 345.0kV.

250.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameBROWNSTOWN - ENRICO FERMI #3 345.0kV
Queue IDJ3845
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity250.0 MW
StateMichigan
CountyMonroe
Point of interconnectionBROWNSTOWN - ENRICO FERMI #3 345.0kV
Requested (queue) date2024-11-27
Proposed in-service date2029-02-09
Operational date2029-02-09
Withdrawn date2026-04-16
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.