Brownsville Energy Storage System (68346_ESSBR)

Brownsville Energy Storage System is a 5.6 MW battery interconnection project in Kings, New York with a current status of operational.

5.6 MWCapacity
OperationalStatus
NYISMarket
BatteryTechnology

Project facts

Canonical nameBrownsville Energy Storage System
Queue ID68346_ESSBR
Statusoperational
Source status(OP) Operating
MarketNYIS
TechnologyBattery
Capacity5.6 MW
StateNew York
CountyKings
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-09-01
Withdrawn date
Developer
Utility / transmission ownerConsolidated Edison Co-NY Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.