Brusselville Solar Energy Center (C24-202)

Brusselville Solar Energy Center is a 170.0 MW other interconnection project in Genesee, New York with a current status of active. It is proposed to connect at Dysinger-New Rochester 345kV Line (DH2).

170.0 MWCapacity
ActiveStatus
BMarket
OtherTechnology

Project facts

Canonical nameBrusselville Solar Energy Center
Queue IDC24-202
Statusactive
Source status7
MarketB
TechnologyOther
Capacity170.0 MW
StateNew York
CountyGenesee
Point of interconnectionDysinger-New Rochester 345kV Line (DH2)
Requested (queue) date2024-09-19
Proposed in-service date—
Operational date—
Withdrawn date—
DeveloperBrusselville Solar, LLC
Utility / transmission ownerNYPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—activehigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata