BSS CNR only (see Q577) (637)

BSS CNR only (see Q577) is a 270.5 MW wind interconnection project in Franklin, Maine with a current status of withdrawn. It is proposed to connect at CMP Larrabee Road Station,345 kV.

270.5 MWCapacity
WithdrawnStatus
MEMarket
WindTechnology

Project facts

Canonical nameBSS CNR only (see Q577)
Queue ID637
Statuswithdrawn
Source statusW
MarketME
TechnologyWind
Capacity270.5 MW
StateMaine
CountyFranklin
Point of interconnectionCMP Larrabee Road Station,345 kV
Requested (queue) date2017-04-13
Proposed in-service date2019-10-31
Operational date
Withdrawn date2019-08-08
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata