Buchanan Point BESS (1068)

Buchanan Point BESS is a 300.0 MW battery interconnection project in Westchester, New York with a current status of withdrawn. It is proposed to connect at Buchanan North Substation 345kV.

300.0 MWCapacity
WithdrawnStatus
HMarket
BatteryTechnology

Project facts

Canonical nameBuchanan Point BESS
Queue ID1068
Statuswithdrawn
Source status0
MarketH
TechnologyBattery
Capacity300.0 MW
StateNew York
CountyWestchester
Point of interconnectionBuchanan North Substation 345kV
Requested (queue) date2020-08-05
Proposed in-service date2024-10-31
Operational date
Withdrawn date
DeveloperJuno Power Management LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.