Buckner 345kV (GEN-2026-PR8)

Buckner 345kV is a 33.1 MW wind interconnection project in Gray County, Kansas with a current status of withdrawn. It is proposed to connect at Buckner 345kV.

33.1 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameBuckner 345kV
Queue IDGEN-2026-PR8
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity33.1 MW
StateKansas
CountyGray County
Point of interconnectionBuckner 345kV
Requested (queue) date2026-02-28
Proposed in-service date2028-12-01
Operational date
Withdrawn date2026-04-17
Developer
Utility / transmission ownerSUNC

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.