Buckner 345kV (GEN-2026-PR8)
Buckner 345kV is a 33.1 MW wind interconnection project in Gray County, Kansas with a current status of withdrawn. It is proposed to connect at Buckner 345kV.
33.1 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology
Project facts
| Canonical name | Buckner 345kV |
|---|---|
| Queue ID | GEN-2026-PR8 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | KS |
| Technology | Wind |
| Capacity | 33.1 MW |
| State | Kansas |
| County | Gray County |
| Point of interconnection | Buckner 345kV |
| Requested (queue) date | 2026-02-28 |
| Proposed in-service date | 2028-12-01 |
| Operational date | — |
| Withdrawn date | 2026-04-17 |
| Developer | — |
| Utility / transmission owner | SUNC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.