Buckner 345kV (GEN-2026-SR2)
Buckner 345kV is a 165.6 MW battery interconnection project in Cimmaron, Kansas with a current status of active. It is proposed to connect at Buckner 345kV.
165.6 MWCapacity
ActiveStatus
KSMarket
BatteryTechnology
Project facts
| Canonical name | Buckner 345kV |
|---|---|
| Queue ID | GEN-2026-SR2 |
| Status | active |
| Source status | SPECIAL STUDY |
| Market | KS |
| Technology | Battery |
| Capacity | 165.6 MW |
| State | Kansas |
| County | Cimmaron |
| Point of interconnection | Buckner 345kV |
| Requested (queue) date | 2025-12-19 |
| Proposed in-service date | 2027-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SUNC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata