Buffalo 115 kV (J3833)

Buffalo 115 kV is a 200.0 MW wind interconnection project in Cass, North Dakota with a current status of operational. It is proposed to connect at Buffalo 115 kV.

200.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameBuffalo 115 kV
Queue IDJ3833
Statusoperational
Source statusActive
Market
TechnologyWind
Capacity200.0 MW
StateNorth Dakota
CountyCass
Point of interconnectionBuffalo 115 kV
Requested (queue) date2024-10-01
Proposed in-service date2028-09-01
Operational date2028-09-01
Withdrawn date
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.