Buffalo 115kV (J1961)

Buffalo 115kV is a 190.0 MW wind interconnection project in Cass, North Dakota with a current status of withdrawn. It is proposed to connect at Buffalo 115kV.

190.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameBuffalo 115kV
Queue IDJ1961
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity190.0 MW
StateNorth Dakota
CountyCass
Point of interconnectionBuffalo 115kV
Requested (queue) date2021-08-25
Proposed in-service date2026-10-01
Operational date2026-10-01
Withdrawn date2025-10-27
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata