Buffalo 345 kV Substation (J4106)

Buffalo 345 kV Substation is a 250.0 MW solar interconnection project in Cass, North Dakota with a current status of withdrawn. It is proposed to connect at Buffalo 345 kV Substation.

250.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBuffalo 345 kV Substation
Queue IDJ4106
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity250.0 MW
StateNorth Dakota
CountyCass
Point of interconnectionBuffalo 345 kV Substation
Requested (queue) date2025-10-06
Proposed in-service date2027-02-15
Operational date2027-02-15
Withdrawn date2026-04-16
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.