Bull Road Data Center (L0527)

Bull Road Data Center is a 250.0 MW other interconnection project in Kittitas, Washington with a current status of withdrawn. It is proposed to connect at Ellensburg-Moxee No 1 115kV line.

250.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameBull Road Data Center
Queue IDL0527
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity250.0 MW
StateWashington
CountyKittitas
Point of interconnectionEllensburg-Moxee No 1 115kV line
Requested (queue) date2022-05-11
Proposed in-service date2025-05-07
Operational date
Withdrawn date
DeveloperCity of Ellensburg
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata