Burches Hill-Chalk Point 500kV (Z1-052)
Burches Hill-Chalk Point 500kV is a 64.5 MW gas interconnection project in Prince George's, Maryland with a current status of operational.
64.5 MWCapacity
OperationalStatus
—Market
GasTechnology
Project facts
| Canonical name | Burches Hill-Chalk Point 500kV |
|---|---|
| Queue ID | Z1-052 |
| Status | operational |
| Source status | In Service |
| Market | — |
| Technology | Gas |
| Capacity | 64.5 MW |
| State | Maryland |
| County | Prince George's |
| Point of interconnection | — |
| Requested (queue) date | 2013-08-29 |
| Proposed in-service date | — |
| Operational date | 2018-08-15 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PEPCO |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata