Burches Hill-Possum Point 500kV (X3-102)

Burches Hill-Possum Point 500kV is a 971.2 MW gas interconnection project in Charles, Maryland with a current status of withdrawn.

971.2 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameBurches Hill-Possum Point 500kV
Queue IDX3-102
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity971.2 MW
StateMaryland
CountyCharles
Point of interconnection—
Requested (queue) date2011-10-31
Proposed in-service date2016-06-01
Operational date—
Withdrawn date2012-06-20
Developer—
Utility / transmission ownerPEPCO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata