Burlington 161 kV Substation (J1479)

Burlington 161 kV Substation is a 100.0 MW battery interconnection project in Des Moines County, Iowa with a current status of withdrawn. It is proposed to connect at Burlington 161 kV Substation.

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameBurlington 161 kV Substation
Queue IDJ1479
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StateIowa
CountyDes Moines County
Point of interconnectionBurlington 161 kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2023-10-01
Operational date2023-10-01
Withdrawn date2022-02-18
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.