Buxmont 69 kV (AD2-077)

Buxmont 69 kV is a 150.0 MW battery interconnection project in Bucks, Pennsylvania with a current status of active.

150.0 MWCapacity
ActiveStatus
—Market
BatteryTechnology

Project facts

Canonical nameBuxmont 69 kV
Queue IDAD2-077
Statusactive
Source statusEngineering and Procurement
Market—
TechnologyBattery
Capacity150.0 MW
StatePennsylvania
CountyBucks
Point of interconnection—
Requested (queue) date2018-03-16
Proposed in-service date2029-07-27
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata