CA1 - West Plains (CS23-09)
CA1 - West Plains is a 39.9 MW battery interconnection project in Spokane, Washington with a current status of withdrawn. It is proposed to connect at Line Tap - Airway - W. Plains 115kV.
39.9 MWCapacity
WithdrawnStatus
WAMarket
BatteryTechnology
Project facts
| Canonical name | CA1 - West Plains |
|---|---|
| Queue ID | CS23-09 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | WA |
| Technology | Battery |
| Capacity | 39.9 MW |
| State | Washington |
| County | Spokane |
| Point of interconnection | Line Tap - Airway - W. Plains 115kV |
| Requested (queue) date | 2023-04-27 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | CA1 - West Plains |
| Utility / transmission owner | Avista Utilities |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata