CA1 - West Plains is a 40.0 MW solar interconnection project in Spokane, Washington with a current status of active. It is proposed to connect at South Fairchild Tap 115kV.

40.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameCA1 - West Plains
Queue IDCS24-14
Statusactive
Source statusLGIA
MarketWA
TechnologySolar
Capacity40.0 MW
StateWashington
CountySpokane
Point of interconnectionSouth Fairchild Tap 115kV
Requested (queue) date2024-04-30
Proposed in-service date2028-06-30
Operational date
Withdrawn date
DeveloperCA1 - West Plains
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata