CA2 - Stratford is a 54.0 MW solar+battery interconnection project in Grant, Washington with a current status of withdrawn. It is proposed to connect at Chelan-Stratford 115kV.

54.0 MWCapacity
WithdrawnStatus
WAMarket
Solar+BatteryTechnology

Project facts

Canonical nameCA2 - Stratford
Queue IDCS25-06
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologySolar+Battery
Capacity54.0 MW
StateWashington
CountyGrant
Point of interconnectionChelan-Stratford 115kV
Requested (queue) date2025-04-29
Proposed in-service date2031-08-31
Operational date—
Withdrawn date—
DeveloperCA2 - Stratford
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-10-05
Data last materially changed2026-10-05
Page data generated2026-10-11

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata