CA5 - Palouse (CS23-06)

CA5 - Palouse is a 220.5 MW wind interconnection project in Whitman, Washington with a current status of active. It is proposed to connect at Shawnee - Thornton 230kV.

220.5 MWCapacity
ActiveStatus
WAMarket
WindTechnology

Project facts

Canonical nameCA5 - Palouse
Queue IDCS23-06
Statusactive
Source statusLGIA
MarketWA
TechnologyWind
Capacity220.5 MW
StateWashington
CountyWhitman
Point of interconnectionShawnee - Thornton 230kV
Requested (queue) date2023-04-14
Proposed in-service date2025-12-15
Operational date
Withdrawn date
DeveloperCA5 - Palouse
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata