CA5 - Palouse (CS24-13)

CA5 - Palouse is a 95.0 MW solar interconnection project in Whitman, Washington with a current status of withdrawn. It is proposed to connect at Benewah-Thornton 230kV.

95.0 MWCapacity
WithdrawnStatus
WAMarket
SolarTechnology

Project facts

Canonical nameCA5 - Palouse
Queue IDCS24-13
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologySolar
Capacity95.0 MW
StateWashington
CountyWhitman
Point of interconnectionBenewah-Thornton 230kV
Requested (queue) date2024-04-30
Proposed in-service date2027-10-26
Operational date
Withdrawn date
DeveloperCA5 - Palouse
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.