CA6 - Lewis Clark (CS23-02)

CA6 - Lewis Clark is a 300.0 MW wind interconnection project in Garfield, Washington with a current status of withdrawn. It is proposed to connect at DryCreek - Talbot 230kV.

300.0 MWCapacity
WithdrawnStatus
WAMarket
WindTechnology

Project facts

Canonical nameCA6 - Lewis Clark
Queue IDCS23-02
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologyWind
Capacity300.0 MW
StateWashington
CountyGarfield
Point of interconnectionDryCreek - Talbot 230kV
Requested (queue) date2023-04-14
Proposed in-service date
Operational date
Withdrawn date
DeveloperCA6 - Lewis Clark
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata