CA8B - Othello (CS24-07)

CA8B - Othello is a 2.0 MW solar interconnection project in Adams, Washington with a current status of active. It is proposed to connect at Othello 13kV.

2.0 MWCapacity
ActiveStatus
WAMarket
SolarTechnology

Project facts

Canonical nameCA8B - Othello
Queue IDCS24-07
Statusactive
Source statusSGIA
MarketWA
TechnologySolar
Capacity2.0 MW
StateWashington
CountyAdams
Point of interconnectionOthello 13kV
Requested (queue) date2024-04-29
Proposed in-service date2024-12-10
Operational date—
Withdrawn date—
DeveloperCA8B - Othello
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.