CA8D - Third & Hatch (CS24-02)

CA8D - Third & Hatch is a 500.0 MW battery interconnection project in Spokane, Washington with a current status of active. It is proposed to connect at Third & Hatch 13kV.

500.0 MWCapacity
ActiveStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameCA8D - Third & Hatch
Queue IDCS24-02
Statusactive
Source statusSGIA
MarketWA
TechnologyBattery
Capacity500.0 MW
StateWashington
CountySpokane
Point of interconnectionThird & Hatch 13kV
Requested (queue) date2024-04-18
Proposed in-service date2025-08-01
Operational date
Withdrawn date
DeveloperCA8D - Third & Hatch
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata