Calamus East 161 kV Substation (J1190)

Calamus East 161 kV Substation is a 200.0 MW solar interconnection project in Clinton County, Iowa with a current status of operational. It is proposed to connect at Calamus East 161 kV Substation.

200.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameCalamus East 161 kV Substation
Queue IDJ1190
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity200.0 MW
StateIowa
CountyClinton County
Point of interconnectionCalamus East 161 kV Substation
Requested (queue) date2019-01-22
Proposed in-service date2023-10-01
Operational date2023-10-01
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata