Carbon - connecting to ITC at Jewel, St-Clair and Spokane substations (J646)

Carbon - connecting to ITC at Jewel, St-Clair and Spokane substations is a 1.6 MW generation interconnection project in Macomb County, Michigan with a current status of operational. It is proposed to connect at Carbon - connecting to ITC at Jewel, St-Clair and Spokane substations.

1.6 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameCarbon - connecting to ITC at Jewel, St-Clair and Spokane substations
Queue IDJ646
Statusoperational
Source statusDone
Market
TechnologyGeneration
Capacity1.6 MW
StateMichigan
CountyMacomb County
Point of interconnectionCarbon - connecting to ITC at Jewel, St-Clair and Spokane substations
Requested (queue) date2016-06-16
Proposed in-service date2010-07-01
Operational date2010-07-01
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.