Carpenter 345 kV Substation (GEN-2022-215)

Carpenter 345 kV Substation is a 154.0 MW solar interconnection project in Stevens, Kansas with a current status of withdrawn. It is proposed to connect at Carpenter 345 kV Substation.

154.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameCarpenter 345 kV Substation
Queue IDGEN-2022-215
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity154.0 MW
StateKansas
CountyStevens
Point of interconnectionCarpenter 345 kV Substation
Requested (queue) date2023-03-02
Proposed in-service date2027-12-15
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.