Carrigan 120kV Substation (J1665)

Carrigan 120kV Substation is a 50.0 MW battery interconnection project in St. Clair, Michigan with a current status of withdrawn. It is proposed to connect at Carrigan 120kV Substation.

50.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameCarrigan 120kV Substation
Queue IDJ1665
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity50.0 MW
StateMichigan
CountySt. Clair
Point of interconnectionCarrigan 120kV Substation
Requested (queue) date2020-06-24
Proposed in-service date2023-09-01
Operational date2023-09-01
Withdrawn date2022-01-05
Developer—
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata