Cassadaga Wind (0387)

Cassadaga Wind is a 126.5 MW wind interconnection project in Chautauqua, New York with a current status of operational. It is proposed to connect at Dunkirk - Moon 115 kV.

126.5 MWCapacity
OperationalStatus
AMarket
WindTechnology

Project facts

Canonical nameCassadaga Wind
Queue ID0387
Statusoperational
Source status14
MarketA
TechnologyWind
Capacity126.5 MW
StateNew York
CountyChautauqua
Point of interconnectionDunkirk - Moon 115 kV
Requested (queue) date2012-07-19
Proposed in-service date
Operational date
Withdrawn date
DeveloperCassadaga Wind, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata