Cassia Gulch (56935_1)

Cassia Gulch is a 18.9 MW wind interconnection project in Twin Falls, Idaho with a current status of operational.

18.9 MWCapacity
OperationalStatus
IPCOMarket
WindTechnology

Project facts

Canonical nameCassia Gulch
Queue ID56935_1
Statusoperational
Source status(OP) Operating
MarketIPCO
TechnologyWind
Capacity18.9 MW
StateIdaho
CountyTwin Falls
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2009-03-01
Withdrawn date—
Developer—
Utility / transmission ownerCassia Gulch Wind Park, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata