Cat Creek Energy, LLC (558)

Cat Creek Energy, LLC is a 120.0 MW solar+battery interconnection project in Jerome, Idaho with a current status of active. It is proposed to connect at Hunt–Milner 138kV Line.

120.0 MWCapacity
ActiveStatus
IDMarket
Solar+BatteryTechnology

Project facts

Canonical nameCat Creek Energy, LLC
Queue ID558
Statusactive
Source statusConstruction
MarketID
TechnologySolar+Battery
Capacity120.0 MW
StateIdaho
CountyJerome
Point of interconnectionHunt–Milner 138kV Line
Requested (queue) date2019-05-14
Proposed in-service date2023-10-31
Operational date—
Withdrawn date—
DeveloperCat Creek Energy, LLC
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-10-05
Data last materially changed2026-10-05
Page data generated2026-10-11

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata