Catskills Renewable Connector (1120)
Catskills Renewable Connector is a 1,200.0 MW other interconnection project in Greene/Queens, New York with a current status of withdrawn. It is proposed to connect at New Scotland-Leeds 345kV, Rainey-Farragut.
1,200.0 MWCapacity
WithdrawnStatus
F, JMarket
OtherTechnology
Project facts
| Canonical name | Catskills Renewable Connector |
|---|---|
| Queue ID | 1120 |
| Status | withdrawn |
| Source status | 0 |
| Market | F, J |
| Technology | Other |
| Capacity | 1,200.0 MW |
| State | New York |
| County | Greene/Queens |
| Point of interconnection | New Scotland-Leeds 345kV, Rainey-Farragut |
| Requested (queue) date | 2020-12-11 |
| Proposed in-service date | 2022-06-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Ravenswood Development, LLC |
| Utility / transmission owner | NGRID |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata