Central Hudson DG CH-03126 (CH-03126)

Central Hudson DG CH-03126 is a 2.0 MW solar interconnection project in Orange, New York with a current status of operational. It is proposed to connect at East Walden / 5041.

2.0 MWCapacity
OperationalStatus
WaldenMarket
SolarTechnology

Project facts

Canonical nameCentral Hudson DG CH-03126
Queue IDCH-03126
Statusoperational
Source statusInterconnected
MarketWalden
TechnologySolar
Capacity2.0 MW
StateNew York
CountyOrange
Point of interconnectionEast Walden / 5041
Requested (queue) date
Proposed in-service date
Operational date2025-12-30
Withdrawn date
DeveloperJoule, LLC
Utility / transmission ownerCentral Hudson

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata