Central Hudson DG CH-03126 (CH-03126)
Central Hudson DG CH-03126 is a 2.0 MW solar interconnection project in Orange, New York with a current status of operational. It is proposed to connect at East Walden / 5041.
2.0 MWCapacity
OperationalStatus
WaldenMarket
SolarTechnology
Project facts
| Canonical name | Central Hudson DG CH-03126 |
|---|---|
| Queue ID | CH-03126 |
| Status | operational |
| Source status | Interconnected |
| Market | Walden |
| Technology | Solar |
| Capacity | 2.0 MW |
| State | New York |
| County | Orange |
| Point of interconnection | East Walden / 5041 |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2025-12-30 |
| Withdrawn date | — |
| Developer | Joule, LLC |
| Utility / transmission owner | Central Hudson |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-05 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27
Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata