Central Hudson DG CH-11873 (CH-11873)

Central Hudson DG CH-11873 is a 2.0 MW solar interconnection project in Greene, New York with a current status of operational. It is proposed to connect at Freehold / 2071.

2.0 MWCapacity
OperationalStatus
CairoMarket
SolarTechnology

Project facts

Canonical nameCentral Hudson DG CH-11873
Queue IDCH-11873
Statusoperational
Source statusInterconnected
MarketCairo
TechnologySolar
Capacity2.0 MW
StateNew York
CountyGreene
Point of interconnectionFreehold / 2071
Requested (queue) date
Proposed in-service date
Operational date2025-11-12
Withdrawn date
DeveloperLumens Holdings 3 LLC
Utility / transmission ownerCentral Hudson

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata