Central Hudson Storage CH-03217 (CH-03217)

Central Hudson Storage CH-03217 is a 2.0 MW battery interconnection project in Dutchess, New York with a current status of operational. It is proposed to connect at Inwood Ave / 6061.

2.0 MWCapacity
OperationalStatus
PoughkeepsieMarket
BatteryTechnology

Project facts

Canonical nameCentral Hudson Storage CH-03217
Queue IDCH-03217
Statusoperational
Source statusInterconnected
MarketPoughkeepsie
TechnologyBattery
Capacity2.0 MW
StateNew York
CountyDutchess
Point of interconnectionInwood Ave / 6061
Requested (queue) date
Proposed in-service date
Operational date2021-01-08
Withdrawn date
DeveloperCypress Creek Renewables
Utility / transmission ownerCentral Hudson

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.